Skip to content
Logótipo Segeltec - Projetos, Engenharia e Manutenção
Logótipo Segeltec - Projetos, Engenharia e Manutenção
Menu
  • About us
  • Contacts
  • English
    • Portuguese (Portugal)
    • Spanish
  • Self-protection measures
    • Self-protection measures
    • Fire Safety Audits
  • Specialty Projects
  • Segeltec Services
    • Simulacrums
    • TIM III – Installation and Maintenance Technician
    • TRE – Electrical Installation Technician in Charge
    • ATEX Prevention Manuals
    • RSUEAP elaboration
    • Preparation for ANEPC Inspection
  • Maintenance Management
  • Formação
    • Desenvolvimento Pessoal
    • Metalurgia e Metalomecânica
    • Segurança Contra Incêndios em Edifícios
      • Técnico Autor Projetista
      • Técnico Manutenção Extintores
      • Técnicos Municipais
      • Técnicos Responsáveis – inicial
        • – Ver Mais –
      • Técnicos Responsáveis – renovação
        • – Ver Mais –
    • Segurança e Higiene no Trabalho
  • – ver mais –
Logotipo Segeltec - Projetos, Engenharia e Manutencao
Logótipo Segeltec - Projetos, Engenharia e Manutenção

installation

TIM III - O Especialista em Instalação e Manutenção de Telecomunicações
Unveiling TIM III – The Telecommunications Installation and Maintenance Specialist
Sem categoriaMarch 25, 2024
Segeltec

Services & Quotes
Self-protection measures, audits, projects and maintenance

+351 922 205 123

(call to national mobile network)

segeltec@segeltec.pt

Training
Courses, enrolment and certificates

+351 963 878 533

(call to national mobile network)

formacao@segeltec.pt

  • Self-protection measures
  • Fire safety audits
  • Maintenance management
  • Specialty projects
  • Training
  • Fire drills
  • TIM III
  • TRE
  • ATEX prevention manuals
  • RSUEAP preparation
  • ANEPC inspection preparation
  • About us
  • Contact
  • Blog
Request a quote
Certificação DGERT - Entidade Formadora Certificada

Head office:
R. Bouça 200 B,
4435-674 Baguim do Monte, Gondomar, Porto, Portugal

Lisbon office:
Rua Rui Belo, nº 6, Loja 11,
2745-252 Monte Abraão, Lisbon, Portugal

Trás-os-Montes office:
Travessa 1º de Maio - 1º andar, sala 2,
5140-093 Carrazeda de Ansiães, Bragança, Portugal

Barra PRR

Project sheet

© 2024 SEGELTEC . All rights reserved

Privacy Policy
Cookies
Go to Top

Menu

  • Self-protection measures
    • Self-protection measures
    • Fire Safety Audits
  • Specialty Projects
  • Segeltec Services
    • Simulacrums
    • TIM III – Installation and Maintenance Technician
    • TRE – Electrical Installation Technician in Charge
    • ATEX Prevention Manuals
    • RSUEAP elaboration
    • Preparation for ANEPC Inspection
  • Maintenance Management
  • Formação
    • Desenvolvimento Pessoal
    • Metalurgia e Metalomecânica
    • Segurança Contra Incêndios em Edifícios
      • Técnico Autor Projetista
      • Técnico Manutenção Extintores
      • Técnicos Municipais
      • Técnicos Responsáveis – inicial
        • – Ver Mais –
      • Técnicos Responsáveis – renovação
        • – Ver Mais –
    • Segurança e Higiene no Trabalho
  • – ver mais –
Podemos ajudar?
WhatsApp
Olá! 👋
Podemos ajudar?
Enviar uma mensagem